Work begins Monday to prepare Lopez Drive Bridge in Arroyo Grande for a seismic retrofit.
Work is expected to run from Monday, Jan. 30 through Wednesday, March 1, from 8:30 a.m. to 4 p.m. and 6 p.m. to 7 a.m. Monday through Friday, weather permitting.